Connected Energy’s 300kW second-life battery storage systems have been installed at two Volvo Trucks UK & Ireland charging workshops to help manage grid connection restraints.
The 99MW/198MWh Clay Tye battery energy storage system (BESS), a joint project between Harmony Energy and Fotowatio Renewable Ventures (FRV), has been set live.