SSEN connects first solar farm using new POC-MAST tech
The first solar site has been connected to the grid using Scottish and Southern Electricity Networks (SSEN) Distribution’s Point of Connection Mast (POC-MAST).
The first solar site has been connected to the grid using Scottish and Southern Electricity Networks (SSEN) Distribution’s Point of Connection Mast (POC-MAST).
Building work on a new solar farm at the Duke of Gloucester Barracks, South Cerney, has been started by 3ti.
The British Army has hailed the installation of a 2.3MW photovoltaic solar farm at its Defence School of Transport (DST), Leconfield.