energy superhub oxford

December 17, 2021
A 5MWh flow battery system installed as part of the Energy Superhub Oxford has been energised by Invinity Energy Systems alongside EDF-owned Pivot Power.
June 23, 2021
Pivot Power, Wärtsilä and Habitat Energy have today (23 June) activated what the trio claim to be the UK’s first grid-scale battery storage system directly connected to the transmission network.
March 10, 2020
RedT has received a provisional notice to manufacture 2MW of storage from Pivot Power, as it unveils a partnership with vanadium producer Bushveld Minerals.

Email Newsletter

Upcoming Events

2 September 2025
Mexico City, Mexico
16 September 2025
Athens, Greece
22 September 2025
Bilbao, Spain
25 November 2025
Warsaw, Poland
24 February 2026
London, UK

You are now subscribed!

Thank you for subscribing to the email newsletter. You can opt-out at any time.