Technology group Wärtsilä has signed a repeat order with EDF Renewables UK to deliver a 57MW/114MWh grid-scale energy storage system (ESS) in Bramford.
Pivot Power, Wärtsilä and Habitat Energy have today (23 June) activated what the trio claim to be the UK’s first grid-scale battery storage system directly connected to the transmission network.
Centrica has completed the deployment of almost 100MW of energy storage capacity across two projects in the UK that are able to respond to peaks in demand within two minutes.