Engineering Recommendation G83/1-1 is a key document for the solar PV industry, as it sets the requirements for the connection of PV systems (of up to 16A per phase), to the distribution network. G83/1 addresses all technical aspects of the connection process from system functionality to site commissioning and was first published in 2002, with a revised version issued in 2008. Last week, the Distribution Code Review Panel (DCRP) approved the draft of ER G83/2 for public consultation.