energy superhub oxford

December 17, 2021
A 5MWh flow battery system installed as part of the Energy Superhub Oxford has been energised by Invinity Energy Systems alongside EDF-owned Pivot Power.
June 23, 2021
Pivot Power, Wärtsilä and Habitat Energy have today (23 June) activated what the trio claim to be the UK’s first grid-scale battery storage system directly connected to the transmission network.
March 10, 2020
RedT has received a provisional notice to manufacture 2MW of storage from Pivot Power, as it unveils a partnership with vanadium producer Bushveld Minerals.

Email Newsletter

Upcoming Events

29 April 2024
London, UK
30 April 2024
London, UK
1 May 2024
Dallas, Texas
21 May 2024
Napa, USA
22 May 2024
London, UK

You are now subscribed!

Thank you for subscribing to the email newsletter. You can opt-out at any time.