Pacific Green Technologies subsidiary, Pacific Green Battery Energy Parks 2 Limited, has acquired 100% of the shares for Sheaf Energy Park from energy originator, Tupa Energy (Holdings) Limited for £7.5 million.
Pacific Green Technologies has appointed Instalcom Limited as the principal contractor for its 99.98MW Richborough Energy Park battery energy storage system (BESS) in Kent.